Build Day #4

Posted by Nathan, Hope and Esmeralda on 2/24/2024 1:00:00 PM

Our Wood Shop students never stop working!  This Saturday they finished a lot during their build time. Some students worked on cutting out the windows. In the meantime, others were finishing up the moisture barrier installation that protects the wood from the rain. While the exterior was being measured for siding and proper sealing was being checked by the contractors, the students started cleanup and dumping the trash. The Wood Shop students are extremely diligent workers! 

Mr. Vidales demonstrating how to attach the moister barrior.

The contractors cutting out the windows.

Students helping to install the moister barrier.

Students helping to install the moister barrier.